SHORT PROFILE
Villa P + 2 it was established in Eforie Nord - panseluta park, behind Union Hotel, 100 metres far away from the black sea beach
It’s composed from 12 hotel rooms arranged by 2 floors, each of them having its own sanitary group, gritstone finished floors, false ceiling Armstrong type and separating walls Rigips type.
The ground floor space it’s designed for: · 60 seats Restaurant · reception desk office · bar inside the restaurant · kitchen for serving the restaurant · space for storing the packing materials There are no endowments under construction.
Inside arrangements works are finished 90 %. Remained works for execution: · false ceiling 100 mp · assembling inside doors 12 nos. · sanitary groups’ equipments · electrical installation equipments
Leased field surface 450 mp. Construction total spread surface 715 mp.
Space distribution it’s described into the bellow profile memorial of the project.
Saling price US$ 294 / mp spread surface = US$ 210.000
For any additional informations:
Eng. Marcel Mengher 093 268 405
PROFILE MEMORIAL
I. GENERAL DETAILS 1. Project Motel & Restaurant 2. Established on Eforie Nord, „Sanatoriu” Area, Lot 157 3. Neighbourhoods - N – designed road - S – lot 156 - E – lot 158 - V – designed road 4. Beneficiary Mengher Marcel 5. Designer S.C. Decodesign-A S.R.L. 6. High Regime Gorund Floor + 2 Floors 7. Field surface 450 m2 8. Proposed building surface 287,70 m2 9. Proposed spreaded surface 715,22 m2 10. P.O.T. 63,93 % C.U.T. 1,58
II. OBJECTIVE
1. THE ARHITECTURE There shall be practiced two main entries: one main entry from designed road and the other one (secondary entry) from opposite side for restaurant supply with merchandises and also for personnel. Because of difficulties created by foundation field, the construction has no basement which involved special and expensive fundationing sollutions. As per founctional point of view, we’re counting the bellow-mentioned spaces:
Ground Floor - distribution lobby 29,96 m2 - tables room 67,17 m2 - coffer 3,32 m2 - kitchen 32,63 m2 - bar store 6,14 m2 - desk office 12,24 m2 - lobby 5,61 m2 - lockers room 7,74 m2 - personnel sanitary group 4,73 m2 - office 14,48 m2 - public sanitary group 9,73 m2 - own thermal station 9,51 m2 Floors 1-2 - distribution lobby 20,30 m2 - badroom 1 23,61 m2 - bathroom 1 5,16 m2 - lobby 1 3,93 m2 - bedroom 2 14,74 m2 - bathroom 2 5,26 m2 - looby 2 3,99 m2 - bedroom 3 14,10 m2 - bathroom 3 4,18 m2 - lobby 3 3,17 m2 - bedroom 4 23,75 m2 - bathroom 4 5,16 m2 - lobby 4 3,93 m2 - bedroom 5 16,75 m2 - bathroom 5 5,50 m2 - lobby 5 3,99 m2 - bedroom 6 25,25 m2 - bathroom 6 4,86 m2 - lobby 6 2,94 m2
Inside finishings
- floors - ceramic gritstone in bathrooms, lobbies, public zone and kitchen - moquette in bedrooms and office - scivisit cement in thermal station - walls and paintings - washable paintings - faiance on batrooms & kitchen walls Outside finishings
- walls - plating with natural stone - cover - thermoisollating pleated iron plate - carpentry - simple from aluminium with thermal bridge breaking & window
2. RESISTANCE
· The construction had metallic structure concrete wrapped, with punctiform foundations, ferro-concrete foundation beams and with ferro-concrete floors. · The covering it’s executed with metallic shapes. · On execution there were used only construction & finishing materials that had quaity certificate.
3. INSTALLATIONS
· All spaces had electrical installations and appropriate water alimentation. · The instalations are executed with authorized and qualified personnel, that have followed as same all applicable rules. · The spaces heating it’s made with radiators connected to our villa’s own thermal station. · Cold domestic water alimentation it’s made from the city water network. · The sewerage of used domestic waters it’s made in city network. · The alimentation with electrical power it’s made also from the city network.
III. CHARACTERISTICS
Construction’s importance classe ”C” Fire resistance level ”I” Necessary checkings at resistance and stability. |
|