The Dover Project

Sponsored By
York Habitat For Humanity

(717) 854-6168
(717) 854-1970 fax
Email:yhfh@yorkhabitat.org
595 W Market Street, York PA 17405
Mail: PO Box 826, York PA 17405


News Release - April 2, 2004

Plot Plan
2004 Build-A-Thon House and Floor Layout Designs
More Facts About The Dover Project Photos


Photos-The Dover Project
Click on the pic to enlarge, then click your
browser's back button to return to this page
Phase 1 - Charles Lane Photos

Saturday, August 21 - 10:00 A.M.
Dedication of the homes of the
Green, Hile and Wintermyers Families.

Under threatening skies, the three homes at 80, 82 and 88 Charles Lane were dedicated, volunteers were recognized, keys to the homes were turned over to their new owners, the open house tours began, and showers of blessing immediately burst forth from the heavens!

The people assemble under threatening skies.
The people assemble under threatening skies.

The dedication service was held in the Charles Lane cul-de-sac.
The dedication service was held in
the Charles Lane cul-de-sac.

'House of the Carpenter' is being read by family members.
"House of the Carpenter" is
being read by family members.

A new home owner expresses her thanks to the many volunteers.
A new home owner expresses her
thanks to the many volunteers.

Her daughter does also.
Her daughter does also.

A second family expresses their thanks too.
A second family expresses their thanks too.

And the third family also.
And the third family also.

80 Charles Lane.
80 Charles Lane.

82 Charles Lane.
82 Charles Lane.

88 Charles Lane.
88 Charles Lane.

The open house tour began just as the rains<BR> 
started.  In moments, it was a cloudburst!
The open house tour began just as the rains started.
In moments, it was a cloudburst!



Tuesday, August 17. Coming down the homestretch! Care-A-Vaneers and AmeriCorps volunteers scurry along, hanging doors and painting walls and floor moldings in preparation for Saturday morning's dedication and open house.

80 Charles Lane
80 Charles Lane.

82 Charles Lane
82 Charles Lane.

80 and 82 Charles Lane as viewed from the southwest corner of the Spring Valley development
80 and 82 Charles Lane as viewed from the
southwest corner of the Spring Valley development.

88 Charles Lane, a 3 br rancher
88 Charles Lane, a 3 br rancher.

A parade of carriers moved the 
many interior doors inside.
A parade of carriers moved the
many interior doors inside.

Another Care-A-Vaneer measures  
a door.  Imprinted on his shirt -  
- - 'Share a little time with us'.
Another Care-A-Vaneer measures
a door. Imprinted on his shirt -
- - "Share a little time with us."

The continual scraping and sweeping up is a 
very important part of building a Habitat house.
The continual scraping and sweeping up is a
very important part of building a Habitat house.

Painting the trim areas.
Painting the trim areas.

A team of Care-A-Vaneers paint 
many strips of floor molding.
A team of Care-A-Vaneers paint
many strips of floor molding.

Wall painting is almost complete.
Wall painting is almost complete.

More door movers.
More door movers.

And more
And more.

And more.
And more.

Laying bricks at 88 Charles Lane.
Laying bricks at 88 Charles Lane.

More bricklaying.
More bricklaying.



August 2. Care-A-Vaneers, volunteers who come from across
the USA with their travel trailers and who will be here
for two weeks, made porch fencing and installed insulation
today at the 80 and 82 Charles Lane houses.

Building porch fencing.
Building porch fencing.

Moving lumber
Moving lumber.

Installing insulation
Installing insulation.

Installing stud bracing
Installing stud bracing.

80 and 82 Charles Lane are progressing nicely.
80 and 82 Charles Lane are progressing nicely.

The 88 Charles Lane ranch style house
The 88 Charles Lane ranch style house



August 2. The Church of Genesis, Newcastle, PA volunteers
install siding while plumbers begin their installations.

80 and 82 Charles Lane.








(BLITZ WEEK!!)













July 20. The street is being paved. The three homes await the Build-A-Thon next week.

80 and 82 Charles Lane.
80 and 82 Charles Lane.

82 and 80 Charles Lane.  Looking back toward the entrance of the cul-de-sac.
82 and 80 Charles Lane. Looking back
toward the entrance of the cul-de-sac.
Looking into the basement of 82 from the rear of the house.
Looking into the basement of 82
from the rear of the house.
Street paving is underway.
Street paving is underway.


July 9. Street curbings are completed. The concrete floors
are being poured and finished on the two bi-level homes.

The curbing installation is complete. The rancher is at left. The two bi-level homes are on the right, partially hidden by the ground piles.

The curbing installation is complete. The rancher is at left.
The two bi-level homes are on the right, partially hidden by the ground piles.

The concrete mixer stands at ready.
The concrete mixer stands at ready.
The partially poured floor.
The partially poured floor.
Semi-finishing the concrete basement floor at 82 Charles Lane.
Semi-finishing the concrete basement
floor at 82 Charles Lane.
Concrete finishing at 80 Charles Lane.
Concrete finishing at 80 Charles Lane.
 


July 6. Street curbings are being installed. Charles Lane is starting
to take shape. And the foundations await the first floor deck construction.

Curbing installations start to form the street's outline.

Curbing installations start to form the street's outline.

The bi-level house foundations at 80 and 82 Charles Lane await the first floor deck.

The bi-level house foundations at 80 and 82 Charles Lane await the first floor deck.

The rancher foundation at 88 also awaits the first floor deck.

The rancher foundation at 88 also awaits the first floor deck.



June 24. The York-Adams Co. Masonry Association workers
construct foundation walls at 80 and 82 Charles Lane.

View looking north into the development. Building the foundation walls at 80 Charles Lane at far left.

View looking north into the development. Building the foundation walls at 80 Charles Lane at far left.

View looking toward the entrance of the development at far left.  Photo taken from 88 Charles Lane.

View looking toward entrance of the development at far left. Photo taken from 88 Charles Lane.






June 16. The footers have been poured at 80, 82 and 88 Charles Lane

80 Charles Lane - foreground; 82 Charles Lane - background
80 Charles Lane - foreground;
82 Charles Lane - background
82 Charles Lane
82 Charles Lane


And more action on June 9 as the Swingin' Seniors roll in to form footers on a 90+ degree day!

Sewer work continues.
Sewer work continues.
Three pieces of earthmoving equipment attack the ground.
Three pieces of earthmoving equipment
attack the ground.
Workmen in the sewer ditch.
Workmen in the sewer ditch.
Pit for the first bi-level home on the left side of the cul-de-sac.  The Swingin' Seniors are calling it a day after completing the footer forms on the adjacent house's basement excavation.
Pit for the first bi-level home on the left side of the cul-de-sac. The Swingin' Seniors are calling it a day after completing the footer forms on the adjacent house's basement excavation.
A Swingin' Senior put his tools away at the end of a very hot and humid day.
A Swingin' Senior put his tools away at the end of a very hot and humid day.
Bill Brillhart, takes his ladder to storage.
Bill Brillhart, a Swingin' Senior takes his ladder to storage.
 


Lots of action on June 8!

Just finished scooping out a shovel-full.
Just finished scooping out a shovel-full.
Looking down the sewer ditch toward the main.
Looking down the sewer ditch toward the main.
Preparing for the main sewer hookup.
Preparing for the main sewer hookup.
Front lot laid out for a bi-level house.  Another bi-level's basement is being excavated.  The third house, a rancher, will be located at a site beyond the stone piles at the end of the cul-de-sac.
Front lot laid out for a bi-level house. Another bi-level's basement is being excavated. The third house, a rancher, will be located at a site beyond the stone piles at the end of the cul-de-sac.
Excavating the pit for the footers on a split level house.
Excavating the pit for the footers on a split level house.
<center><strong>Another view of the excavation-second house on the left in Spring Manor.</strong></center>
Another view of the excavation- second house on the left in Spring Valley Manor.


Excavating a small pit. June 1, 2004
The construction site - June 1, 2004.
Excavating a small pit. June 1, 2004
The construction site - June 1, 2004.

May 20, 2004

Placing dynamite for sewer ditch in Charles Lane.
Charles Lane is being prepared for dynamiting the sewer ditch.
The construction site
Placing dynamite for the sewer ditch in Charles Lane.
Charles Lane is being prepared for dynamiting the sewer ditch.
The construction site


Charles Lane, January, 2004
Second Day of Excavation - May 5, 2004
Monday, May 10, 2004
Charles Lane -
January, 2004
Second Day of
Excavation -
May 5, 2004
Monday, May 10, 2004



Links:

York Habitat For Humanity.

"Building On Faith 2003" Project-N. Broad Street, York

Habitat For Humanity International




1